Statements (30)
| Predicate | Object |
|---|---|
| gptkbp:instanceOf |
gptkb:hydroelectric_power_station
|
| gptkbp:annualGeneration |
30.7 TWh
|
| gptkbp:capacity |
6,448 MW
|
| gptkbp:constructionStartYear |
2006
|
| gptkbp:country |
gptkb:China
|
| gptkbp:crosses |
gptkb:Jinsha_River
|
| gptkbp:damVolume |
7,700,000 m³
|
| gptkbp:firstGeneratorCommissioned |
2012
|
| gptkbp:hasSpillway |
service, controlled
|
| gptkbp:hasTower |
8
|
| gptkbp:height |
161 m
|
| gptkbp:lastGeneratorCommissioned |
2014
|
| gptkbp:length |
909 m
|
| gptkbp:location |
gptkb:Jinsha_River
|
| gptkbp:mapType |
gptkb:China
|
| gptkbp:opened |
2012
|
| gptkbp:operator |
gptkb:China_Yangtze_Power
|
| gptkbp:owner |
gptkb:China_Three_Gorges_Corporation
|
| gptkbp:province |
gptkb:Sichuan
gptkb:Yunnan |
| gptkbp:purpose |
power generation
|
| gptkbp:reservoirCapacity |
5.163 billion m³
|
| gptkbp:status |
operational
|
| gptkbp:turbineType |
gptkb:Francis
|
| gptkbp:type |
gptkb:concrete_gravity_dam
|
| gptkbp:website |
http://www.ctg.com.cn
|
| gptkbp:bfsParent |
gptkb:China_Yangtze_Power
gptkb:Jinsha_River |
| gptkbp:bfsLayer |
6
|
| https://www.w3.org/2000/01/rdf-schema#label |
Xiangjiaba Dam
|