Statements (23)
| Predicate | Object |
|---|---|
| gptkbp:instanceOf |
gptkb:road
|
| gptkbp:connects |
gptkb:Owairaka
gptkb:Waterview |
| gptkbp:constructionStartYear |
2011
|
| gptkbp:cost |
NZ$1.4 billion
|
| gptkbp:country |
gptkb:New_Zealand
|
| gptkbp:hasVentilationShafts |
yes
|
| gptkbp:length |
2.4 km
|
| gptkbp:location |
gptkb:Auckland
|
| gptkbp:maximumSpeed |
80 km/h
|
| gptkbp:notableFor |
longest road tunnel in New Zealand
|
| gptkbp:numberOfExits |
yes
|
| gptkbp:numberOfLanes |
3
|
| gptkbp:opened |
2017
|
| gptkbp:operator |
gptkb:NZ_Transport_Agency
|
| gptkbp:partOf |
gptkb:State_Highway_20
gptkb:Auckland_Western_Ring_Route Waterview Connection |
| gptkbp:toll |
no
|
| gptkbp:tunnel |
gptkb:road
|
| gptkbp:bfsParent |
gptkb:Waterview
|
| gptkbp:bfsLayer |
7
|
| https://www.w3.org/2000/01/rdf-schema#label |
Waterview Tunnel
|