Statements (18)
| Predicate | Object |
|---|---|
| gptkbp:instanceOf |
gptkb:bridge
|
| gptkbp:connects |
gptkb:Trent_Basin
gptkb:Lady_Bay |
| gptkbp:constructionStartYear |
2023
|
| gptkbp:crosses |
River Trent
|
| gptkbp:designer |
gptkb:Mott_MacDonald
|
| gptkbp:expectedCompletion |
2025
|
| gptkbp:fundedBy |
gptkb:Transforming_Cities_Fund
|
| gptkbp:length |
circa 140 metres
|
| gptkbp:location |
gptkb:Nottingham,_England
|
| gptkbp:material |
gptkb:steel
|
| gptkbp:owner |
Nottingham City Council
|
| gptkbp:purpose |
pedestrian and cycle bridge
|
| gptkbp:status |
under construction
|
| gptkbp:width |
4.5 metres
|
| gptkbp:bfsParent |
gptkb:River_Ythan
|
| gptkbp:bfsLayer |
6
|
| https://www.w3.org/2000/01/rdf-schema#label |
Waterside Bridge
|