Statements (61)
Predicate | Object |
---|---|
gptkbp:instance_of |
gptkb:cave
|
gptkbp:bfsLayer |
5
|
gptkbp:bfsParent |
gptkb:Vejle,_Denmark
gptkb:Vejle |
gptkbp:accessibility |
Direct access to Vejle city
|
gptkbp:awards |
Received accolades for design
|
gptkbp:challenges |
Navigating underwater geology
|
gptkbp:community_engagement |
Public consultations held
|
gptkbp:community_events |
Open days held for public access.
|
gptkbp:connects |
gptkb:E45_motorway
|
gptkbp:conservation_status |
Conducted prior to construction
|
gptkbp:constructed_in |
gptkb:1976
gptkb:1980 4 years Excavation and concrete lining |
gptkbp:construction_cost |
Approx. 300 million DKK
|
gptkbp:construction_material |
Reinforced concrete
Modern tunneling techniques |
gptkbp:criteria |
Aesthetic integration with landscape
|
gptkbp:crosses |
gptkb:Vejle_Fjord
|
gptkbp:depth |
up to 30 meters below sea level
|
gptkbp:design |
Cut-and-cover
Led by Danish engineers |
gptkbp:emergency_services |
gptkb:battle
Established evacuation procedures Dedicated access routes Regular training for responders |
gptkbp:enforces |
Monitored and reported
|
gptkbp:environmental_impact |
Minimized disruption to the fjord
|
gptkbp:feedback |
Generally positive responses
|
gptkbp:future_plans |
Potential upgrades planned
|
gptkbp:geological_formation |
Challenging due to soft soil
|
gptkbp:has_public_transport |
Bus routes available
|
gptkbp:historical_significance |
Part of Denmark's infrastructure development
|
https://www.w3.org/2000/01/rdf-schema#label |
Vejle Tunnel
|
gptkbp:impact |
Temporary road closures during construction
Completed before project initiation Designed to withstand harsh weather |
gptkbp:is_monitored_by |
CCTV installed
|
gptkbp:landmark |
Recognized engineering feat
|
gptkbp:length |
1,700 meters
|
gptkbp:lighting |
LED lights
|
gptkbp:local_economy |
Boosts local businesses
|
gptkbp:local_government |
Strong backing from local authorities
|
gptkbp:location |
gptkb:Vejle,_Denmark
|
gptkbp:maintenance |
Regular inspections
|
gptkbp:opened |
gptkb:1980
|
gptkbp:owner |
gptkb:Danish_Road_Directorate
|
gptkbp:project |
gptkb:Danish_Road_Directorate
|
gptkbp:public_perception |
Regular updates provided to citizens
|
gptkbp:receives_funding_from |
Government funded
|
gptkbp:safety_features |
Ventilation system
Regular safety drills conducted Speed limits enforced |
gptkbp:seating_capacity |
Motor vehicles
Approximately 20,000 vehicles per day Real-time monitoring system |
gptkbp:significance |
Major transport route
|
gptkbp:tourist_attraction |
Attracts visitors for its engineering
|
gptkbp:transportation |
No tolls
|
gptkbp:type |
Road tunnel
|