Toowoomba Second Range Crossing
GPTKB entity
Statements (25)
Predicate | Object |
---|---|
gptkbp:instanceOf |
gptkb:infrastructure
bypass |
gptkbp:alsoKnownAs |
Toowoomba Bypass
|
gptkbp:connects |
gptkb:Warrego_Highway
Gore Highway |
gptkbp:constructionStartYear |
2015
|
gptkbp:cost |
A$1.6 billion
|
gptkbp:country |
gptkb:Australia
|
gptkbp:features |
gptkb:bridge
bridges tunnels |
gptkbp:fundedBy |
gptkb:Government_of_India
gptkb:Queensland_Government |
https://www.w3.org/2000/01/rdf-schema#label |
Toowoomba Second Range Crossing
|
gptkbp:length |
41 km
|
gptkbp:location |
gptkb:Toowoomba,_Queensland,_Australia
|
gptkbp:managedBy |
Nexus Infrastructure
|
gptkbp:opened |
2019
|
gptkbp:operator |
Nexus Operations
|
gptkbp:partOf |
National Highway A2
|
gptkbp:purpose |
divert heavy and through traffic from Toowoomba city
|
gptkbp:regionServed |
gptkb:Darling_Downs
|
gptkbp:toll |
yes
|
gptkbp:bfsParent |
gptkb:Warrego_Highway
|
gptkbp:bfsLayer |
7
|