Toledo Direct Reduction Plant
GPTKB entity
Statements (19)
| Predicate | Object |
|---|---|
| gptkbp:instanceOf |
gptkb:industry
|
| gptkbp:address |
4401 Front Street, Toledo, Ohio
|
| gptkbp:capacity |
1.9 million metric tons per year
|
| gptkbp:constructionStartYear |
2017
|
| gptkbp:cost |
$700 million
|
| gptkbp:employs |
over 160 people
|
| gptkbp:fuelType |
natural gas
|
| gptkbp:industry |
gptkb:steel
|
| gptkbp:locatedIn |
gptkb:Toledo,_Ohio
|
| gptkbp:opened |
2020
|
| gptkbp:operatedBy |
gptkb:Cleveland-Cliffs_Inc.
|
| gptkbp:ownedBy |
gptkb:Cleveland-Cliffs_Inc.
|
| gptkbp:partner |
Midrex Technologies
|
| gptkbp:product |
hot briquetted iron
|
| gptkbp:purpose |
supply feedstock for electric arc furnaces
|
| gptkbp:significance |
largest direct reduction plant in North America (as of 2023)
|
| gptkbp:bfsParent |
gptkb:Cleveland-Cliffs
|
| gptkbp:bfsLayer |
6
|
| https://www.w3.org/2000/01/rdf-schema#label |
Toledo Direct Reduction Plant
|