Toledo Direct Reduction Plant
GPTKB entity
Statements (19)
Predicate | Object |
---|---|
gptkbp:instanceOf |
gptkb:industry
|
gptkbp:address |
4401 Front Street, Toledo, Ohio
|
gptkbp:capacity |
1.9 million metric tons per year
|
gptkbp:constructionStartYear |
2017
|
gptkbp:cost |
$700 million
|
gptkbp:employs |
over 160 people
|
gptkbp:fuelType |
natural gas
|
https://www.w3.org/2000/01/rdf-schema#label |
Toledo Direct Reduction Plant
|
gptkbp:industry |
gptkb:steel
|
gptkbp:locatedIn |
gptkb:Toledo,_Ohio
|
gptkbp:opened |
2020
|
gptkbp:operatedBy |
gptkb:Cleveland-Cliffs_Inc.
|
gptkbp:ownedBy |
gptkb:Cleveland-Cliffs_Inc.
|
gptkbp:partner |
Midrex Technologies
|
gptkbp:product |
hot briquetted iron
|
gptkbp:purpose |
supply feedstock for electric arc furnaces
|
gptkbp:significance |
largest direct reduction plant in North America (as of 2023)
|
gptkbp:bfsParent |
gptkb:Cleveland-Cliffs
|
gptkbp:bfsLayer |
6
|