Properties (49)
Predicate | Object |
---|---|
gptkbp:instanceOf |
dam
|
gptkbp:affiliatedWith |
water treatment facilities
power lines access roads |
gptkbp:annualVisitors |
2,000 GWh
|
gptkbp:benefits |
water supply
irrigation flood control |
gptkbp:communityImpact |
recreational activities
increased tourism local employment |
gptkbp:completed |
2010
|
gptkbp:constructionMaterial |
$300 million
earthfill |
gptkbp:constructionStarted |
2005
|
gptkbp:country |
gptkb:Syria
|
gptkbp:designedBy |
gptkb:Syrian_government
|
gptkbp:emergencyServices |
yes
safety drills evacuation routes flood response plan |
gptkbp:engineType |
4 turbines
|
gptkbp:environmentalImpact |
habitat alteration
|
gptkbp:futurePlans |
expansion
sustainability initiatives upgrades |
gptkbp:geographicalFeature |
36.1° N, 38.5° E
|
gptkbp:hasCapacity |
630 MW
|
gptkbp:height |
40 meters
|
gptkbp:historicalSignificance |
regional cooperation
symbol of development part of national infrastructure |
https://www.w3.org/2000/01/rdf-schema#label |
Tishrin Dam
|
gptkbp:length |
400 meters
|
gptkbp:lighting |
500 cubic meters per second
|
gptkbp:location |
gptkb:Syria
|
gptkbp:maintenance |
regular inspections
sediment management repair works |
gptkbp:operator |
Electricity_Generation_Company_of_Syria
|
gptkbp:owner |
gptkb:Syrian_government
|
gptkbp:primaryMission |
hydroelectric power generation
|
gptkbp:reservoir |
1.5 billion cubic meters
|
gptkbp:river |
gptkb:Euphrates_River
|
gptkbp:soundtrack |
earthquake resistant
|
gptkbp:spillwayType |
gated spillway
|
gptkbp:status |
operational
|
gptkbp:type |
embankment dam
|
gptkbp:waterQuality |
yes
|