Statements (23)
Predicate | Object |
---|---|
gptkbp:instanceOf |
gptkb:bridge
|
gptkbp:cost |
$732,000
|
gptkbp:crosses |
gptkb:Sturgeon_Creek
gptkb:Tittabawassee_River gptkb:Chippewa_River |
gptkbp:designer |
gptkb:Jeffrey_Morrison
|
gptkbp:featuredIn |
Midland city logo
|
gptkbp:hasPlaque |
yes
|
https://www.w3.org/2000/01/rdf-schema#label |
The Tridge
|
gptkbp:length |
180 feet (each leg)
|
gptkbp:location |
gptkb:Midland,_Michigan
|
gptkbp:maintainedBy |
gptkb:City_of_Midland
|
gptkbp:material |
wood
|
gptkbp:numberOfSpans |
3
|
gptkbp:opened |
1981
|
gptkbp:renovated |
2017
|
gptkbp:touristAttraction |
yes
|
gptkbp:type |
three-way footbridge
|
gptkbp:usedFor |
pedestrian traffic
bicycle traffic |
gptkbp:width |
8 feet
|
gptkbp:bfsParent |
gptkb:Great_Lakes_Bay_Region
|
gptkbp:bfsLayer |
6
|