Statements (59)
Predicate | Object |
---|---|
gptkbp:instance_of |
gptkb:infrastructure
|
gptkbp:benefits |
economic growth
local job creation long-term sustainability reduce sewage overflow |
gptkbp:challenges |
urban environment
navigating existing infrastructure |
gptkbp:community_engagement |
ongoing
|
gptkbp:community_feedback |
incorporated into planning
|
gptkbp:community_impact |
minimized disruption
|
gptkbp:construction_material |
cut-and-cover method
|
gptkbp:construction_method |
tunneling
trenchless technology |
gptkbp:construction_started |
gptkb:2016
|
gptkbp:design |
gptkb:BAM_Nuttall
deep tunnel system |
gptkbp:diameter |
7.2 meters
|
gptkbp:employees |
thousands employed
|
gptkbp:environmental_impact |
completed
improves water quality |
gptkbp:funding |
private investment
secured through bonds |
gptkbp:historical_achievement |
first phase completed
|
https://www.w3.org/2000/01/rdf-schema#label |
The Thames Tideway Tunnel
|
gptkbp:impact |
temporary road closures
enhanced flood resilience largest infrastructure project in London |
gptkbp:innovation |
advanced tunneling techniques
|
gptkbp:is_monitored_by |
real-time data collection
|
gptkbp:legacy |
improved urban drainage
|
gptkbp:length |
25 kilometers
|
gptkbp:location |
River Thames, London
|
gptkbp:mission |
environmental protection
|
gptkbp:operator |
gptkb:Thames_Water
|
gptkbp:price |
£4.2 billion
|
gptkbp:project |
gptkb:Costain
gptkb:Partnerships 9 years collaborative approach anticipated in 2025 delayed due to unforeseen circumstances Thames Water's 21st Century Drainage Strategy |
gptkbp:project_funding_model |
regulated asset base
|
gptkbp:provides_oversight_for |
gptkb:Thames_Tideway_Limited
|
gptkbp:public_awareness |
increased through campaigns
|
gptkbp:public_health_benefit |
reduces flooding risks
|
gptkbp:purpose |
sewage management
|
gptkbp:regulatory_body |
gptkb:Environment_Agency
|
gptkbp:risk_factor |
groundwater management
|
gptkbp:scope |
includes multiple shafts
|
gptkbp:stakeholders |
local residents
|
gptkbp:support |
conducted prior to construction
|
gptkbp:sustainability_efforts |
reduce pollution
|
gptkbp:tunnel_depth |
up to 70 meters
|
gptkbp:water_management |
improves treatment capacity
|
gptkbp:year |
2025
under construction |
gptkbp:bfsParent |
gptkb:Buro_Happold
|
gptkbp:bfsLayer |
5
|