gptkbp:instanceOf |
geothermal power project
|
gptkbp:capacity |
168 MW (Stage 1)
~150 MW (Stage 2, planned) |
gptkbp:commissioned |
2023 (Stage 1, expected)
|
gptkbp:country |
gptkb:New_Zealand
|
gptkbp:developer |
gptkb:Contact_Energy
|
https://www.w3.org/2000/01/rdf-schema#label |
Tauhara Stage 1 and Stage 2 projects
|
gptkbp:location |
gptkb:Taupō,_New_Zealand
|
gptkbp:numberOfStages |
gptkb:Stage_1
Stage 2 |
gptkbp:powerSource |
geothermal
|
gptkbp:purpose |
electricity generation
|
gptkbp:status |
under development
|
gptkbp:bfsParent |
gptkb:Tauhara_geothermal_field
|
gptkbp:bfsLayer |
8
|