Tappan Zee Bridge Replacement

GPTKB entity

Statements (47)
Predicate Object
gptkbp:instanceOf bridge project
gptkbp:awards received multiple accolades
gptkbp:built 2013
2017
4 years
weather and logistics
design-build
addressed through innovative solutions
gptkbp:community_impact positive economic development
gptkbp:community_outreach ongoing during project
gptkbp:crosses gptkb:Hudson_River
gptkbp:design gptkb:T.Y._Lin_International
gptkb:Tappan_Zee_Constructors,_LLC
gptkbp:design_feature LED lighting
gptkbp:emergencyServices provided
gptkbp:environmental_impact mitigated through planning
gptkbp:features dedicated bike and pedestrian path
gptkbp:funding federal and state funds
gptkbp:future_plans monitoring and maintenance
gptkbp:height approximately 40 feet above water
https://www.w3.org/2000/01/rdf-schema#label Tappan Zee Bridge Replacement
gptkbp:inspiration modern aesthetics
gptkbp:landmark not designated
gptkbp:length 3.1 miles
gptkbp:location gptkb:New_York
gptkbp:maintenance gptkb:New_York_State_Thruway_Authority
gptkbp:offers $4 billion
gptkbp:opened 2017
gptkbp:owner gptkb:New_York_State_Thruway_Authority
gptkbp:passenger_traffic 6 lanes
approximately 140,000 vehicles per day
3 in each direction
implemented during construction
gptkbp:productionCompany over 1,000 employed
gptkbp:productLine 1,200 feet
gptkbp:project 2018
gptkbp:provides_access_to yes
gptkbp:public_perception conducted during planning
gptkbp:public_transport_access yes
gptkbp:replacedBy gptkb:Tappan_Zee_Bridge
gptkbp:research conducted prior to construction
gptkbp:sacraments held in August 2017
gptkbp:safety_features modern engineering standards
gptkbp:significance major transportation link
gptkbp:toll yes
varies by vehicle type
gptkbp:type cable-stayed bridge