Tappan Zee Bridge Replacement
GPTKB entity
Statements (53)
Predicate | Object |
---|---|
gptkbp:instance_of |
gptkb:bridge
|
gptkbp:academic_programs |
gptkb:T._Y._Lin_International
|
gptkbp:architect |
gptkb:STV_Group
|
gptkbp:awards |
held for bridge design
|
gptkbp:benefits |
economic growth in the area
|
gptkbp:bridge_aesthetics |
modern design with scenic views
|
gptkbp:challenges |
river navigation and environmental concerns
|
gptkbp:community_engagement |
community meetings held
|
gptkbp:community_impact |
improved regional connectivity
|
gptkbp:connects |
Rockland County and Westchester County
|
gptkbp:construction_cost |
$3.9 billion
|
gptkbp:construction_material |
steel and concrete
|
gptkbp:construction_method |
design-build
|
gptkbp:construction_started |
gptkb:2013
gptkb:2017 4 years accelerated to meet demand. |
gptkbp:design |
gptkb:Tappan_Zee_Constructors,_LLC
cable-stayed bridge |
gptkbp:design_feature |
LED lighting system
|
gptkbp:emergency_services |
3 lanes in each direction
improved access for emergency vehicles |
gptkbp:employees |
thousands employed during construction
|
gptkbp:enforces |
enhanced through design features
|
gptkbp:environmental_impact |
mitigated through planning
completed prior to construction |
gptkbp:features |
dedicated bike and pedestrian path
|
gptkbp:funding |
federal and state funds
|
gptkbp:has_public_transport |
planned for future expansion
bus rapid transit provision |
gptkbp:has_toll |
varies by vehicle type
|
gptkbp:height |
approximately 50 feet above the water
|
https://www.w3.org/2000/01/rdf-schema#label |
Tappan Zee Bridge Replacement
|
gptkbp:landmark |
not designated as a historic landmark
|
gptkbp:length |
3.1 miles
|
gptkbp:location |
gptkb:New_York
|
gptkbp:maintenance |
gptkb:New_York_State_Thruway_Authority
|
gptkbp:opened |
gptkb:2017
|
gptkbp:opening_ceremony |
August 2017
|
gptkbp:owner |
gptkb:New_York_State_Thruway_Authority
|
gptkbp:passenger_traffic |
approximately 140,000 vehicles per day
improved compared to previous bridge smart technology implemented |
gptkbp:project |
gptkb:Governor_Mario_M._Cuomo_Bridge
|
gptkbp:replaces |
gptkb:Tappan_Zee_Bridge
|
gptkbp:revenue |
tolls
|
gptkbp:safety_features |
emergency lanes
|
gptkbp:wing_configuration |
1,200 feet
cable-stayed bridge designed to accommodate shipping traffic ongoing inspections required |
gptkbp:bfsParent |
gptkb:Kiewit_Corporation
|
gptkbp:bfsLayer |
5
|