Statements (23)
Predicate | Object |
---|---|
gptkbp:instanceOf |
electricity transmission network
|
gptkbp:abbreviation |
TANESCO grid
|
gptkbp:connectedTo |
gptkb:Kenya_national_grid
gptkb:Zambia_national_grid Uganda national grid |
gptkbp:country |
gptkb:Tanzania
|
gptkbp:expansionProjects |
400 kV Backbone Transmission Project
Julius Nyerere Hydropower Project North West Grid Extension |
https://www.w3.org/2000/01/rdf-schema#label |
Tanzania national grid
|
gptkbp:length |
over 3,000 km
|
gptkbp:mainGenerationSources |
natural gas
hydropower thermal power |
gptkbp:operatedBy |
gptkb:Tanzania_Electric_Supply_Company_Limited
|
gptkbp:operatingSystem |
132 kV
33 kV 66 kV 220 kV |
gptkbp:purpose |
transmission of electricity
|
gptkbp:regulates |
Energy and Water Utilities Regulatory Authority
|
gptkbp:bfsParent |
gptkb:Kinyerezi_I_Thermal_Power_Station
|
gptkbp:bfsLayer |
8
|