Statements (17)
| Predicate | Object |
|---|---|
| gptkbp:instanceOf |
gptkb:bridge
|
| gptkbp:crosses |
gptkb:Clarence_River
|
| gptkbp:culturalHeritage |
yes
|
| gptkbp:demolished |
2020
|
| gptkbp:designer |
Public Works Department of New South Wales
|
| gptkbp:length |
305 metres
|
| gptkbp:locatedIn |
Tabulam, New South Wales
|
| gptkbp:material |
gptkb:wood
|
| gptkbp:notableFor |
one of the longest timber truss bridges in Australia
|
| gptkbp:numberOfSpans |
42
|
| gptkbp:opened |
1903
|
| gptkbp:owner |
gptkb:Transport_for_NSW
|
| gptkbp:replacedBy |
new concrete bridge (2020)
|
| gptkbp:type |
timber truss bridge
|
| gptkbp:bfsParent |
gptkb:Tabulam,_New_South_Wales,_Australia
|
| gptkbp:bfsLayer |
7
|
| https://www.w3.org/2000/01/rdf-schema#label |
Tabulam Bridge
|