Syston and Peterborough Railway
GPTKB entity
Statements (24)
| Predicate | Object |
|---|---|
| gptkbp:instanceOf |
gptkb:railway_line
|
| gptkbp:connects |
gptkb:Peterborough
gptkb:Syston |
| gptkbp:hasStation |
gptkb:Peterborough
gptkb:Stamford gptkb:Melton_Mowbray gptkb:Oakham |
| gptkbp:historicalEvent |
opened in stages between 1846 and 1848
|
| gptkbp:length |
approx. 48 miles
|
| gptkbp:locatedIn |
gptkb:England
|
| gptkbp:opened |
1846
|
| gptkbp:originalOperator |
gptkb:Midland_Railway
|
| gptkbp:partOf |
gptkb:Midland_Main_Line
|
| gptkbp:serves |
gptkb:Cambridgeshire
gptkb:Rutland Leicestershire |
| gptkbp:status |
operational
|
| gptkbp:trackGauge |
standard gauge
|
| gptkbp:usedBy |
freight trains
passenger trains |
| gptkbp:bfsParent |
gptkb:Melton_Mowbray_station
gptkb:Oakham_railway_station |
| gptkbp:bfsLayer |
7
|
| https://www.w3.org/2000/01/rdf-schema#label |
Syston and Peterborough Railway
|