gptkbp:instanceOf |
power transmission line
|
gptkbp:commissioned |
2021
|
gptkbp:constructionStartYear |
2012
|
gptkbp:country |
gptkb:Sweden
|
gptkbp:endPoint |
gptkb:Snogeröd
|
https://www.w3.org/2000/01/rdf-schema#label |
Sydvästlänken
|
gptkbp:length |
435 km
|
gptkbp:operatingSystem |
400 kV
|
gptkbp:operator |
gptkb:Svenska_kraftnät
|
gptkbp:ownedBy |
gptkb:Svenska_kraftnät
|
gptkbp:purpose |
improve electricity transmission between central and southern Sweden
facilitate integration of renewable energy |
gptkbp:regionServed |
central Sweden
southern Sweden |
gptkbp:startPoint |
gptkb:Hallsberg
|
gptkbp:status |
in operation
|
gptkbp:technology |
gptkb:HVDC
|
gptkbp:type |
HVDC transmission line
|
gptkbp:bfsParent |
gptkb:Marensjön
|