Subansiri Lower Hydroelectric Project
GPTKB entity
Statements (29)
| Predicate | Object |
|---|---|
| gptkbp:instanceOf |
gptkb:hydroelectric_power_station
|
| gptkbp:catchment_area_(km2) |
25700
|
| gptkbp:constructionStartYear |
2005
|
| gptkbp:controversy |
environmental concerns
seismic safety concerns local protests |
| gptkbp:country |
gptkb:India
|
| gptkbp:dam |
gptkb:concrete_gravity_dam
|
| gptkbp:district |
gptkb:Dhemaji
gptkb:Lower_Subansiri |
| gptkbp:expectedCommissioning |
2024
|
| gptkbp:fundedBy |
gptkb:Government_of_India
|
| gptkbp:hasTower |
8
|
| gptkbp:height_(m) |
116
|
| gptkbp:length_(m) |
284
|
| gptkbp:location |
gptkb:Arunachal_Pradesh
gptkb:Assam |
| gptkbp:operator |
gptkb:NHPC_Limited
|
| gptkbp:planned_capacity_(MW) |
2000
|
| gptkbp:project_cost_(INR) |
over 20,000 crore
|
| gptkbp:purpose |
power generation
|
| gptkbp:reservoir_capacity_(million_m3) |
1365
|
| gptkbp:river |
gptkb:Subansiri_River
|
| gptkbp:status |
under construction
|
| gptkbp:turbine_capacity |
250
|
| gptkbp:turbineType |
Francis-type
|
| gptkbp:bfsParent |
gptkb:NHPC_Limited
|
| gptkbp:bfsLayer |
8
|
| https://www.w3.org/2000/01/rdf-schema#label |
Subansiri Lower Hydroelectric Project
|