Subansiri Lower Hydroelectric Project
GPTKB entity
Statements (29)
Predicate | Object |
---|---|
gptkbp:instanceOf |
gptkb:hydroelectric_power_station
|
gptkbp:catchment_area_(km2) |
25700
|
gptkbp:constructionStartYear |
2005
|
gptkbp:controversy |
environmental concerns
seismic safety concerns local protests |
gptkbp:country |
gptkb:India
|
gptkbp:dam |
gptkb:concrete_gravity_dam
|
gptkbp:district |
gptkb:Dhemaji
gptkb:Lower_Subansiri |
gptkbp:expectedCommissioning |
2024
|
gptkbp:fundedBy |
gptkb:Government_of_India
|
gptkbp:hasTower |
8
|
gptkbp:height_(m) |
116
|
https://www.w3.org/2000/01/rdf-schema#label |
Subansiri Lower Hydroelectric Project
|
gptkbp:length_(m) |
284
|
gptkbp:location |
gptkb:Arunachal_Pradesh
gptkb:Assam |
gptkbp:operator |
gptkb:NHPC_Limited
|
gptkbp:planned_capacity_(MW) |
2000
|
gptkbp:project_cost_(INR) |
over 20,000 crore
|
gptkbp:purpose |
power generation
|
gptkbp:reservoir_capacity_(million_m3) |
1365
|
gptkbp:river |
gptkb:Subansiri_River
|
gptkbp:status |
under construction
|
gptkbp:turbine_capacity |
250
|
gptkbp:turbineType |
Francis-type
|
gptkbp:bfsParent |
gptkb:NHPC_Limited
|
gptkbp:bfsLayer |
6
|