Stretto di Messina Bridge

GPTKB entity

Statements (102)
Predicate Object
gptkbp:instance_of gptkb:bridge
gptkbp:academic_programs innovative
gptkbp:awards none yet
gptkbp:budget approximately 6 billion euros
6 billion euros
gptkbp:challenges high
strong currents
gptkbp:community_engagement necessary
gptkbp:connects gptkb:Sicily
mainland Italy
Mainland Italy
gptkbp:construction_material steel and concrete
gptkbp:construction_method advanced
gptkbp:construction_started proposed
uncertain
not started
not determined
gptkbp:cultural_exchange increased
gptkbp:cultural_impact potentially transformative
gptkbp:cultural_significance high
symbol of Italian engineering
gptkbp:design completed
iconic structure
gptkbp:design_features aesthetic appeal
aerial cable system
gptkbp:designed_by gptkb:Calatrava
gptkbp:engineering_feasibility assessed
gptkbp:environmental_concerns yes
impact on marine life
gptkbp:environmental_impact negative
required
gptkbp:feasibility_studies conducted
gptkbp:funding required
government and private investment
gptkbp:future_plans ongoing discussions
gptkbp:future_prospects optimistic
gptkbp:government gptkb:Italian_government
gptkbp:has_public_transport yes
planned
gptkbp:height 65 meters
approximately 200 meters
gptkbp:historical_context proposals since the 19th century
gptkbp:historical_significance gptkb:significant
https://www.w3.org/2000/01/rdf-schema#label Stretto di Messina Bridge
gptkbp:impact gptkb:economic_development
designed for seismic activity
temporary disruptions
gptkbp:innovation notable
gptkbp:investment sought
gptkbp:is_opposed_by local communities
gptkbp:length no
not specified
3.3 kilometers
approximately 3.3 kilometers
gptkbp:local_economy positive
gptkbp:local_government gptkb:Italian_government
gptkbp:location gptkb:Messina_Strait
gptkbp:maintenance high
regular inspections
gptkbp:notable_release gptkb:2006
gptkbp:participating_nations high
gptkbp:passenger_traffic high volume
road and rail
approximately 6,000 vehicles per hour
gptkbp:projected_height 65 meters
gptkbp:projected_length 3.3 kilometers
gptkbp:proposed_by gptkb:1969
gptkb:Italian_government
gptkbp:proposed_construction_duration 5 years
gptkbp:proposed_design_competition held in 2003
gptkbp:proposed_economic_benefits job creation
gptkbp:proposed_environmental_studies ongoing
gptkbp:proposed_feasibility_studies completed
gptkbp:proposed_height gptkb:200_meters
gptkbp:proposed_impact_assessments required
gptkbp:proposed_international_collaboration possible
gptkbp:proposed_legal_challenges anticipated
gptkbp:proposed_opening not determined
gptkbp:proposed_pedestrian_lanes 2 lanes
gptkbp:proposed_public_consultations held
gptkbp:proposed_rail_lanes 2 lanes
gptkbp:proposed_regional_integration enhanced
gptkbp:proposed_span 1,500 meters
gptkbp:proposed_technological_innovations yes
gptkbp:proposed_toll yes
gptkbp:proposed_traffic_lanes 4 lanes
gptkbp:public_interest high
gptkbp:public_perception mixed
gptkbp:railway_access planned
gptkbp:safety yes
gptkbp:safety_measures gptkb:advanced_technology
high standards
gptkbp:significance strategic transport link
gptkbp:status proposed
gptkbp:supports two main towers
gptkbp:tourism_impact positive
potential increase
gptkbp:type gptkb:bridge
gptkbp:water_resistance designed to withstand high winds
gptkbp:width approximately 30 meters
gptkbp:year gptkb:unknown
not determined