Statements (28)
| Predicate | Object |
|---|---|
| gptkbp:instanceOf |
gptkb:infrastructure
|
| gptkbp:connects |
gptkb:Sicily
gptkb:Calabria |
| gptkbp:crosses |
gptkb:Strait_of_Messina
|
| gptkbp:debatedBy |
gptkb:19th_century
|
| gptkbp:engineeringChallenges |
deep water
strong currents seismic activity |
| gptkbp:estimatedCost |
over 6 billion euros
|
| gptkbp:expectedImpact |
economic development
improved connectivity |
| gptkbp:locatedIn |
gptkb:Italy
|
| gptkbp:mainProponent |
gptkb:Italian_government
|
| gptkbp:opposedBy |
environmental groups
|
| gptkbp:possibleValues |
gptkb:bridge
gptkb:tunnel |
| gptkbp:potentialLength |
3.3 kilometers
|
| gptkbp:previouslyCancelled |
2013
|
| gptkbp:projectRevived |
2023
|
| gptkbp:proposedStructure |
gptkb:bridge
gptkb:tunnel |
| gptkbp:purpose |
transportation link
|
| gptkbp:status |
proposed
|
| gptkbp:wouldCarry |
rail traffic
road traffic |
| gptkbp:bfsParent |
gptkb:Messina,_Italy
|
| gptkbp:bfsLayer |
7
|
| https://www.w3.org/2000/01/rdf-schema#label |
Strait of Messina crossing
|