Properties (60)
Predicate | Object |
---|---|
gptkbp:instanceOf |
gptkb:spacecraft
|
gptkbp:capacity |
up to 7 crew members
|
gptkbp:CEO |
equipped with solar panels
|
gptkbp:collaborations |
involves international partners
|
gptkbp:communicationEquipment |
advanced communication systems
|
gptkbp:construction_cost |
estimated at $4.5 billion
|
gptkbp:controls |
autonomous docking
system integration completed |
gptkbp:coolingSystem |
ablative heat shield
|
gptkbp:crew |
launch abort system
user-friendly crew interface extensive crew training program crew health monitoring systems comfortable crew accommodation crew access arm crew recovery operations planned |
gptkbp:design |
based_on_CST-100_design
|
gptkbp:emergencyServices |
comprehensive emergency procedures
|
gptkbp:firstFlight |
2019
OFT-1 multiple test flights conducted OFT-2 advanced flight software used |
gptkbp:future_plans |
various mission objectives defined
|
https://www.w3.org/2000/01/rdf-schema#label |
Starliner Spacecraft
|
gptkbp:integration |
integration testing performed
|
gptkbp:interiorFeatures |
modular interior design
|
gptkbp:is_part_of |
gptkb:NASA's_Commercial_Crew_Program
|
gptkbp:landingGear |
parachute and airbag system
|
gptkbp:launchDate |
scheduled for 2023
|
gptkbp:launched |
specific launch windows required
extensive launch preparations required post-launch evaluation conducted requires_launch_approval_from_NASA |
gptkbp:launchSite |
gptkb:Florida,_USA
gptkb:Cape_Canaveral_Space_Force_Station |
gptkbp:launchVehicle |
Atlas V
|
gptkbp:manufacturer |
gptkb:Boeing
|
gptkbp:missionCapabilities |
post-mission analysis conducted
|
gptkbp:missions |
fly-by-wire system
NASA_mission_control_support |
gptkbp:navigationEquipment |
advanced navigation system
|
gptkbp:notableEvent |
gptkb:Commercial_Crew_Program
|
gptkbp:operational_status |
designed for multiple missions
|
gptkbp:orbitalInclination |
achieves orbital insertion
|
gptkbp:partnerships |
collaborates_with_NASA_and_other_partners
|
gptkbp:passenger_traffic |
up to 500 kg of cargo
up to 3,300 kg to ISS |
gptkbp:providesServices |
environmental control and life support system
|
gptkbp:purpose |
crew transport
|
gptkbp:recalls |
recovery operations planned
|
gptkbp:reliability |
reusable
|
gptkbp:returnPolicy |
splashdown in the ocean
|
gptkbp:safety |
NASA_certified
|
gptkbp:safety_features |
extensive safety tests conducted
|
gptkbp:status |
in development
|
gptkbp:systemRequirements |
multiple system redundancies
|
gptkbp:targets |
low_Earth_orbit
|
gptkbp:tourism |
approximately 10 days
|
gptkbp:weight |
approximately 13,000 pounds
|