Srisailam Hydro Power Station
GPTKB entity
Properties (52)
Predicate | Object |
---|---|
gptkbp:instanceOf |
gptkb:hydroelectric_power_station
|
gptkbp:advocacy |
Conducted on water conservation.
|
gptkbp:built |
1970
1981 |
gptkbp:capacity |
150 MW
|
gptkbp:collaborations |
Part of inter-state water agreements
|
gptkbp:commissioned |
1981
|
gptkbp:community_engagement |
Involved in local development projects
|
gptkbp:community_impact |
Displacement of local communities
|
gptkbp:construction_cost |
Estimated at ₹1,500 crore
|
gptkbp:cultural_significance |
Local festivals related to water
|
gptkbp:electrification |
gptkb:Francis_turbine
|
gptkbp:emergencyServices |
Available
|
gptkbp:emissionsStandard |
Contributes to lower carbon footprint
|
gptkbp:environmental_impact |
Altered local ecology
Monsoon dependent |
gptkbp:famous_for |
Largest_hydroelectric_project_in_South_India
|
gptkbp:fuel_capacity |
High
|
gptkbp:future_plans |
Established
|
gptkbp:futurePlans |
Under consideration
|
gptkbp:gridConnection |
Southern_Grid
|
gptkbp:height |
145 meters
|
gptkbp:historical_significance |
One of the first major projects post-independence
|
https://www.w3.org/2000/01/rdf-schema#label |
Srisailam Hydro Power Station
|
gptkbp:is_a_source_of |
Hydroelectric power generation
Irrigation |
gptkbp:length |
1,670 meters
|
gptkbp:lighting |
Yes
|
gptkbp:localGovernment |
Involved in decision making
|
gptkbp:location |
Srisailam,_Andhra_Pradesh,_India
|
gptkbp:maintenance |
Regular inspections
|
gptkbp:nearby_attractions |
Yes
|
gptkbp:operational_status |
1,670 MW
|
gptkbp:operator |
gptkb:Andhra_Pradesh_Power_Generation_Corporation
|
gptkbp:owner |
Government of Andhra Pradesh
|
gptkbp:powerOutput |
State and national grids
Andhra_Pradesh_and_Telangana |
gptkbp:powers |
In place with various states
|
gptkbp:produces |
6
|
gptkbp:productionYears |
5,000 GWh
|
gptkbp:research |
Conducted on ecological impact
|
gptkbp:reservoir |
gptkb:Srisailam_Reservoir
|
gptkbp:river |
gptkb:Krishna_River
|
gptkbp:safetyFeatures |
Implemented
|
gptkbp:spillwayType |
1,000,000 cusecs
|
gptkbp:type |
Concrete gravity dam
|
gptkbp:waterManagement |
Conducted regularly
Critical for irrigation |
gptkbp:waterQuality |
Regularly performed
3,660 million cubic meters |
gptkbp:wildlife |
Affected by dam construction
|
gptkbp:youth_development |
Promotes local economy
|