Statements (53)
Predicate | Object |
---|---|
gptkbp:instanceOf |
railway line
|
gptkbp:accessibility |
step-free access at some stations
|
gptkbp:climbRate |
increased frequency
|
gptkbp:communityEvents |
sponsorship of local events
|
gptkbp:communityImpact |
supports local economy
|
gptkbp:connects |
gptkb:London_Underground
National_Rail_services |
gptkbp:culturalSignificance |
featured in local media
|
gptkbp:electrification |
overhead line
|
gptkbp:emergencyServices |
cooperation with local authorities
|
gptkbp:environmentalImpact |
efforts to reduce carbon emissions
|
gptkbp:futurePlans |
upgrades and electrification
consideration for new stops |
gptkbp:historicalSignificance |
part of the original railway network
|
gptkbp:historicalSite |
originally opened stations
|
https://www.w3.org/2000/01/rdf-schema#label |
Southend Line
|
gptkbp:languageSpoken |
reduced frequency
|
gptkbp:length |
approximately 40 miles
|
gptkbp:maintenance |
regular inspections
|
gptkbp:majorStations |
gptkb:Southend_Central
Barking Basildon Laindon Upminster Southend_East |
gptkbp:opened |
1856
|
gptkbp:operatedBy |
c2c
|
gptkbp:operatesIn |
gptkb:London
gptkb:Southend-on-Sea |
gptkbp:owner |
c2c
|
gptkbp:partnerships |
collaboration with local businesses
|
gptkbp:partOf |
gptkb:Transport_for_London_network
|
gptkbp:passengerCapacity |
real-time updates
over 10 million annually regular surveys conducted |
gptkbp:renovated |
ongoing improvements
|
gptkbp:safetyFeatures |
generally safe operations
modern signaling systems |
gptkbp:scenicViews |
Thames estuary
|
gptkbp:seasonalActivities |
special services during events
|
gptkbp:services |
frequent services
|
gptkbp:serviceType |
express service
stopping service |
gptkbp:stations |
16 stations
|
gptkbp:terminus |
gptkb:London_Fenchurch_Street
gptkb:Southend_Victoria |
gptkbp:ticketingSystem |
contactless payment
Oyster card paper tickets |
gptkbp:trainTypes |
diesel multiple units
electric multiple units |
gptkbp:travelTime |
approximately 1 hour
|
gptkbp:type |
commuter rail
|