Site C Dam

GPTKB entity

Statements (115)
Predicate Object
gptkbp:instance_of gptkb:dam
gptkbp:accessories secured
gptkbp:benefits renewable energy
local jobs
local community benefits
gptkbp:biodiversity monitored
gptkbp:capacity 1,100 megawatts
gptkbp:challenges geological
faced construction challenges
gptkbp:climate_adaptation part of adaptation strategy
gptkbp:climate_impact considered
gptkbp:community_engagement ongoing
gptkbp:community_feedback sought
gptkbp:community_involvement enhanced
gptkbp:community_partnerships established
gptkbp:community_support some community support
gptkbp:constructed_in gptkb:BC_Hydro
gptkbp:construction_cost $10.7 billion CAD
gptkbp:construction_material concrete and steel
local sources
gptkbp:construction_method conventional
gptkbp:construction_started gptkb:2015
ongoing
delayed
gptkbp:controversy Indigenous land rights
gptkbp:cultural_heritage impact on cultural heritage sites
gptkbp:electrification 1,100 megawatts
gptkbp:emergency_services in place
emergency preparedness plans in place
gptkbp:emissions_standard gptkb:significant
gptkbp:employees diverse workforce
gptkbp:employs 1,500 jobs
1,500 jobs during construction
gptkbp:energy_transition supports
part of energy transition strategy
gptkbp:environmental_concerns complied with
aligned with provincial energy policy
gptkbp:environmental_impact completed
controversial
gptkbp:fishing_impact negative
impact on local fisheries
gptkbp:flood_control provides flood control
5,550 hectares
part of function
gptkbp:fuel_economy improved
gptkbp:funding gptkb:public_funding
government and private
gptkbp:grid_position yes
gptkbp:growth_rate $1 billion annually
gptkbp:height 60 meters
gptkbp:historical_significance regional economic impact
https://www.w3.org/2000/01/rdf-schema#label Site C Dam
gptkbp:hydrology gptkb:significant
altered hydrology
gptkbp:impact completed
gptkbp:impact_on_indigenous_land yes
gptkbp:indigenous_consultation required consultation
gptkbp:infrastructure transmission lines
gptkbp:is_monitored_by implemented
gptkbp:is_opposed_by high
exists
gptkbp:is_visible_from ensured
gptkbp:land_use gptkb:significant
gptkbp:legal_issue ongoing
faced legal challenges
gptkbp:length 1,050 meters
gptkbp:lifespan 100 years
gptkbp:local_economy positive
gptkbp:location gptkb:Peace_River,_British_Columbia,_Canada
gptkb:British_Columbia
gptkbp:mitigation_measures proposed
gptkbp:occurs_annually 5,100 gigawatt-hours
gptkbp:owner gptkb:BC_Hydro
gptkbp:power_source renewable
gptkbp:prevention mitigation measures in place
gptkbp:price $10.7 billion
gptkbp:primary_use electricity generation
gptkbp:project gptkb:BC_Hydro
gptkb:Site_C_Clean_Energy_Project
delayed
sustainable energy future
managed by BC Hydro
gptkbp:projected_energy_output stable energy output
gptkbp:recreation created
gptkbp:regulatory_body gptkb:British_Columbia_Utilities_Commission
gptkbp:regulatory_compliance yes
received
gptkbp:reservoir gptkb:Site_C_Reservoir
9.4 million cubic meters
gptkbp:river gptkb:Peace_River
gptkbp:safety prioritized
ensured public safety
gptkbp:safety_features modern safety features
gptkbp:safety_measures high
gptkbp:spillway_type gated spillway
gptkbp:stakeholders critical
gptkbp:status under construction
gptkbp:storage yes
limited energy storage
gptkbp:support required
gptkbp:turbine_type Francis turbines
8 turbines
gptkbp:type gptkb:river
gptkbp:water_management negotiated
integrated water management
integrated
controlled water releases
gptkbp:water_quality assessed
potential water quality impact
gptkbp:water_source gptkb:Peace_River
Peace River watershed
gptkbp:wildlife gptkb:significant
gptkbp:year 2025
gptkbp:bfsParent gptkb:SNC-Lavalin_Group_Inc.
gptkbp:bfsLayer 5