Sellwood Bridge (2016–present)
GPTKB entity
Statements (22)
Predicate | Object |
---|---|
gptkbp:instanceOf |
gptkb:bridge
|
gptkbp:architect |
gptkb:T.Y._Lin_International
|
gptkbp:carries |
gptkb:SE_Tacoma_Street
bicycles pedestrians |
gptkbp:cost |
$328 million
|
gptkbp:crosses |
gptkb:Willamette_River
|
gptkbp:designer |
deck arch bridge
|
gptkbp:engineer |
gptkb:CH2M_Hill
|
gptkbp:hasBicycleFacilities |
yes
|
https://www.w3.org/2000/01/rdf-schema#label |
Sellwood Bridge (2016–present)
|
gptkbp:length |
1,976 feet
|
gptkbp:locatedIn |
gptkb:Portland,_Oregon
|
gptkbp:maintainedBy |
gptkb:Multnomah_County
|
gptkbp:material |
gptkb:steel
concrete |
gptkbp:numberOfLanes |
2
|
gptkbp:opened |
2016
|
gptkbp:replacedBy |
gptkb:Sellwood_Bridge_(1925–2016)
|
gptkbp:width |
64 feet
|
gptkbp:bfsParent |
gptkb:original_Sellwood_Bridge_(1925–2016)
|
gptkbp:bfsLayer |
6
|