San Diego-Coronado Bridge (architectural design)
GPTKB entity
Statements (21)
Predicate | Object |
---|---|
gptkbp:instanceOf |
architectural style
|
gptkbp:appliesTo |
gptkb:San_Diego-Coronado_Bridge
|
gptkbp:crosses |
gptkb:San_Diego_Bay
|
gptkbp:designer |
gptkb:Robert_Mosher
|
gptkbp:feature |
curved alignment
box girder construction vertical clearance for naval ships |
https://www.w3.org/2000/01/rdf-schema#label |
San Diego-Coronado Bridge (architectural design)
|
gptkbp:length |
2.12 miles
|
gptkbp:location |
gptkb:Coronado,_California
gptkb:San_Diego,_California |
gptkbp:mainSpan |
660 feet
|
gptkbp:material |
gptkb:steel
reinforced concrete |
gptkbp:numberOfLanes |
5
|
gptkbp:opened |
August 3, 1969
|
gptkbp:style |
Modernist
|
gptkbp:type |
continuous box girder
|
gptkbp:bfsParent |
gptkb:Frank_L._Hope_&_Associates
gptkb:Frank_L._Hope_and_Associates |
gptkbp:bfsLayer |
7
|