Rotherhithe Tunnel

GPTKB entity

Statements (53)
Predicate Object
gptkbp:instance_of gptkb:cave
gptkbp:bfsLayer 5
gptkbp:bfsParent gptkb:Rotherhithe
gptkb:Sir_John_Wolfe_Barry
gptkb:Marc_Isambard_Brunel
gptkbp:connects Rotherhithe and Wapping
gptkbp:constructed_in 1904
1908
Bored tunnel
Cut-and-cover method used
gptkbp:construction_cost £1.2 million
gptkbp:crosses gptkb:River_Thames
gptkbp:cultural_significance Part of London's transport history
gptkbp:depth 15 meters
gptkbp:designed_by gptkb:Sir_Alexander_Binnie
gptkbp:emergency_services gptkb:battle
Two lanes
Quick response time
Intercom system present
gptkbp:enforces Occasional accidents reported
gptkbp:environmental_impact Minimal
gptkbp:explores gptkb:battle
gptkbp:future_plans Ongoing maintenance and upgrades.
gptkbp:has_public_transport gptkb:battle
gptkbp:height 4.5 meters
gptkbp:historical_significance gptkb:First_underwater_road_tunnel_in_London
https://www.w3.org/2000/01/rdf-schema#label Rotherhithe Tunnel
gptkbp:inscription Directional signs present
gptkbp:is_monitored_by CCTV installed
gptkbp:landmark gptkb:battle
gptkbp:length 1,200 meters
gptkbp:lighting LED lighting installed
gptkbp:location gptkb:London,_England
gptkbp:maintenance gptkb:Transport_for_London
Regular inspections conducted
gptkbp:max_speed 30 mph
gptkbp:open_to_public 1908
gptkbp:opened gptkb:King_Edward_VII
1908
gptkbp:parking gptkb:battle
gptkbp:public_perception Generally positive
gptkbp:renovated gptkb:2000
gptkb:battle
£500,000
Structural repairs
gptkbp:safety_features Ventilation shafts
gptkbp:seating_capacity Motor vehicles
Approximately 20,000 vehicles per day
gptkbp:surface gptkb:Asphalt
gptkbp:ticketing_system Traffic lights
gptkbp:transportation No tolls
gptkbp:type Underwater tunnel
gptkbp:width 7.5 meters