Rockaway Boardwalk Reconstruction
GPTKB entity
Statements (18)
Predicate | Object |
---|---|
gptkbp:instanceOf |
gptkb:infrastructure
|
gptkbp:completedIn |
2017
|
gptkbp:cost |
$341 million
|
gptkbp:features |
art installations
bike lanes wave-shaped design resilient to future storms |
https://www.w3.org/2000/01/rdf-schema#label |
Rockaway Boardwalk Reconstruction
|
gptkbp:initiatedAfter |
gptkb:Hurricane_Sandy
|
gptkbp:length |
5.5 miles
|
gptkbp:location |
gptkb:Rockaway_Beach,_Queens,_New_York_City
|
gptkbp:managedBy |
gptkb:New_York_City_Department_of_Parks_and_Recreation
|
gptkbp:material |
concrete
|
gptkbp:purpose |
restore and improve boardwalk destroyed by Hurricane Sandy
|
gptkbp:replacedMaterial |
wood
|
gptkbp:startDate |
2014
|
gptkbp:bfsParent |
gptkb:WXY_architecture_+_urban_design
|
gptkbp:bfsLayer |
7
|