Statements (18)
Predicate | Object |
---|---|
gptkbp:instanceOf |
gptkb:train
|
gptkbp:connectsTo |
gptkb:Sammamish_River_Trail
gptkb:East_Lake_Sammamish_Trail |
gptkbp:followedBy |
former BNSF Railway corridor
|
https://www.w3.org/2000/01/rdf-schema#label |
Redmond Central Connector
|
gptkbp:length |
3.9 miles
|
gptkbp:location |
gptkb:Redmond,_Washington
|
gptkbp:managedBy |
gptkb:City_of_Redmond
|
gptkbp:opened |
2013
|
gptkbp:openToPublic |
Yes
|
gptkbp:period |
Phase 1 completed in 2013
Phase 2 completed in 2017 |
gptkbp:surface |
paved
|
gptkbp:usedFor |
running
walking biking |
gptkbp:bfsParent |
gptkb:Downtown_Redmond
|
gptkbp:bfsLayer |
7
|