Red Line extension to MidAmerica St. Louis Airport (under construction)
URI: https://gptkb.org/entity/Red_Line_extension_to_MidAmerica_St._Louis_Airport_(under_construction)
GPTKB entity
Statements (14)
Predicate | Object |
---|---|
gptkbp:instanceOf |
gptkb:railway_line
|
gptkbp:endPoint |
gptkb:MidAmerica_St._Louis_Airport
|
gptkbp:expectedCompletion |
2025
|
gptkbp:fundedBy |
federal, state, and local funds
|
https://www.w3.org/2000/01/rdf-schema#label |
Red Line extension to MidAmerica St. Louis Airport (under construction)
|
gptkbp:length |
5.2 miles
|
gptkbp:location |
gptkb:St._Clair_County,_Illinois
|
gptkbp:operator |
gptkb:Bi-State_Development_Agency
|
gptkbp:partOf |
gptkb:St._Louis_MetroLink_Red_Line
|
gptkbp:serves |
gptkb:MidAmerica_St._Louis_Airport
|
gptkbp:startPoint |
Shiloh-Scott MetroLink station
|
gptkbp:status |
under construction
|
gptkbp:bfsParent |
gptkb:MetroLink_(light_rail)
|
gptkbp:bfsLayer |
8
|