Statements (62)
Predicate | Object |
---|---|
gptkbp:instanceOf |
tramway system
|
gptkbp:accessibility |
wheelchair accessible
|
gptkbp:annualRidership |
around 30,000
approximately 10 million |
gptkbp:averageTemperature |
Line 1: 15 km
Line 2: 4 km |
gptkbp:built |
2008
|
gptkbp:community_impact |
improves local economy
|
gptkbp:connects |
Rabat_and_Salé
|
gptkbp:construction_cost |
approximately 1.5 billion MAD
|
gptkbp:cultural_significance |
promotes urban mobility
|
gptkbp:design |
gptkb:Alstom
low-floor design |
gptkbp:energyEfficiency |
highly energy efficient
|
gptkbp:environmental_impact |
reduces traffic congestion
reduces air pollution |
gptkbp:environmentalProtection |
reduces carbon footprint
|
gptkbp:feedback |
generally high
positive community feedback |
gptkbp:frequency |
every 10-15 minutes
|
gptkbp:funding |
government and private investment
|
gptkbp:futurePlans |
additional lines
|
gptkbp:height |
3.65 meters
|
https://www.w3.org/2000/01/rdf-schema#label |
Rabat-Salé tramway system
|
gptkbp:integration |
bus services
|
gptkbp:is_part_of |
public transport network
|
gptkbp:length |
32 meters
approximately 19 km |
gptkbp:location |
gptkb:Rabat,_Morocco
|
gptkbp:maintenance |
located_in_Salé
|
gptkbp:manufacturer |
gptkb:Alstom
|
gptkbp:noise_level |
low noise operation
|
gptkbp:opened |
2011
|
gptkbp:opening_hours |
5:30 AM to midnight
|
gptkbp:operator |
gptkb:Rabat-Salé_Tramway_Company
RATP Dev |
gptkbp:passenger_traffic |
designed for comfort
|
gptkbp:powerOutput |
overhead lines
|
gptkbp:productionCompany |
gptkb:Bouygues_Travaux_Publics
|
gptkbp:productLine |
2
Line 1 Line 2 |
gptkbp:railwayLine |
blue and white
Wi-Fi availability approximately 300 passengers up to 20 Citadis trams modern and eco-friendly maximum speed of 70 km/h regular and systematic |
gptkbp:reliability |
high reliability
|
gptkbp:safety_features |
CCTV surveillance
|
gptkbp:safetyFeatures |
meets international standards
|
gptkbp:speed |
20 km/h
|
gptkbp:stations |
27
|
gptkbp:sustainability_initiatives |
integrated with urban planning
|
gptkbp:ticket_sales |
6 MAD
|
gptkbp:ticketingSystem |
contactless smart cards
zone-based pricing |
gptkbp:transportation |
light rail
|
gptkbp:weight |
approximately 40 tons
|
gptkbp:width |
2.65 meters
|