Statements (27)
| Predicate | Object |
|---|---|
| gptkbp:instanceOf |
gptkb:infrastructure
|
| gptkbp:depthOfDepression |
up to 133 meters below sea level
|
| gptkbp:energyPotential |
estimated 670 megawatts (historical estimate)
|
| gptkbp:environmentalImpact |
potential ecological impact
salinization risk |
| gptkbp:lengthOfCanal |
about 55 to 80 kilometers (proposed)
|
| gptkbp:locatedIn |
gptkb:Egypt
gptkb:Qattara_Depression |
| gptkbp:method |
tunnel construction
canal construction nuclear explosion excavation (proposed) |
| gptkbp:notableFeature |
never implemented
subject of feasibility studies would create artificial lake |
| gptkbp:potentialOutput |
hydroelectricity
new inland sea |
| gptkbp:proposedBy |
gptkb:John_Ball
1920s |
| gptkbp:purpose |
hydroelectric power generation
land reclamation |
| gptkbp:relatedTo |
gptkb:Mediterranean_Sea
gptkb:Qattara_Depression |
| gptkbp:status |
proposed
|
| gptkbp:waterSource |
gptkb:Mediterranean_Sea
|
| gptkbp:bfsParent |
gptkb:Qattara_Depression
|
| gptkbp:bfsLayer |
6
|
| https://www.w3.org/2000/01/rdf-schema#label |
Qattara Depression Project
|