Statements (23)
| Predicate | Object |
|---|---|
| gptkbp:instanceOf |
gptkb:hydroelectric_power_station
|
| gptkbp:capacity |
3,300 MW
|
| gptkbp:constructionStartYear |
2004
|
| gptkbp:country |
gptkb:China
|
| gptkbp:dam |
gptkb:concrete_gravity_dam
|
| gptkbp:hasTower |
4
|
| gptkbp:height |
186 m
|
| gptkbp:latitude |
29.5933
|
| gptkbp:length |
828 m
|
| gptkbp:locatedIn |
gptkb:Sichuan_Province
|
| gptkbp:locatedOnRiver |
gptkb:Dadu_River
|
| gptkbp:longitude |
102.8133
|
| gptkbp:opened |
2010
|
| gptkbp:operator |
gptkb:Sichuan_Pubugou_Hydropower_Co.,_Ltd.
|
| gptkbp:owner |
gptkb:China_Huaneng_Group
|
| gptkbp:purpose |
power generation
|
| gptkbp:reservoirCapacity |
5.39 billion m³
|
| gptkbp:reservoirName |
gptkb:Pubugou_Reservoir
|
| gptkbp:status |
operational
|
| gptkbp:turbineType |
Francis-type
|
| gptkbp:bfsParent |
gptkb:Dadu_River
|
| gptkbp:bfsLayer |
6
|
| https://www.w3.org/2000/01/rdf-schema#label |
Pubugou Dam
|