Statements (26)
| Predicate | Object | 
|---|---|
| gptkbp:instanceOf | gptkb:bridge | 
| gptkbp:carries | gptkb:Highway_1 | 
| gptkbp:connects | gptkb:Coquitlam gptkb:Surrey | 
| gptkbp:constructionStartYear | 2009 | 
| gptkbp:cost | approximately $3.3 billion (project) | 
| gptkbp:crosses | gptkb:Fraser_River | 
| gptkbp:designer | gptkb:TY_Lin_International | 
| gptkbp:followedBy | gptkb:Golden_Ears_Bridge | 
| gptkbp:hasBicycleFacilities | yes | 
| gptkbp:latitude | 49.2217 | 
| gptkbp:length | 2,020 metres | 
| gptkbp:location | gptkb:British_Columbia | 
| gptkbp:longitude | -122.8206 | 
| gptkbp:maintainedBy | gptkb:British_Columbia_Ministry_of_Transportation_and_Infrastructure | 
| gptkbp:numberOfLanes | 10 | 
| gptkbp:opened | 2012 September 2012 | 
| gptkbp:partOf | gptkb:state_highway | 
| gptkbp:precededBy | gptkb:Pattullo_Bridge | 
| gptkbp:replacedBy | gptkb:original_Port_Mann_Bridge | 
| gptkbp:toll | no (tolls removed in 2017) | 
| gptkbp:type | gptkb:bridge | 
| gptkbp:bfsParent | gptkb:Fraser_River | 
| gptkbp:bfsLayer | 5 | 
| https://www.w3.org/2000/01/rdf-schema#label | Port Mann Bridge |