Statements (26)
Predicate | Object |
---|---|
gptkbp:instanceOf |
gptkb:bridge
|
gptkbp:carries |
gptkb:Highway_1
|
gptkbp:connects |
gptkb:Coquitlam
gptkb:Surrey |
gptkbp:constructionStartYear |
2009
|
gptkbp:cost |
approximately $3.3 billion (project)
|
gptkbp:crosses |
gptkb:Fraser_River
|
gptkbp:designer |
gptkb:TY_Lin_International
|
gptkbp:followedBy |
gptkb:Golden_Ears_Bridge
|
gptkbp:hasBicycleFacilities |
yes
|
https://www.w3.org/2000/01/rdf-schema#label |
Port Mann Bridge
|
gptkbp:latitude |
49.2217
|
gptkbp:length |
2,020 metres
|
gptkbp:location |
gptkb:British_Columbia
|
gptkbp:longitude |
-122.8206
|
gptkbp:maintainedBy |
gptkb:British_Columbia_Ministry_of_Transportation_and_Infrastructure
|
gptkbp:numberOfLanes |
10
|
gptkbp:opened |
2012
September 2012 |
gptkbp:partOf |
gptkb:state_highway
|
gptkbp:precededBy |
gptkb:Pattullo_Bridge
|
gptkbp:replacedBy |
gptkb:original_Port_Mann_Bridge
|
gptkbp:toll |
no (tolls removed in 2017)
|
gptkbp:type |
gptkb:bridge
|
gptkbp:bfsParent |
gptkb:Fraser_River
|
gptkbp:bfsLayer |
5
|