Pikeville Cut-Through Project

GPTKB entity

Properties (49)
Predicate Object
gptkbp:instanceOf gptkb:infrastructure_project
gptkbp:benefits economic development
gptkbp:built 9 years
cut-and-cover
geological issues
gptkbp:community_involvement public meetings
gptkbp:communityEvents held to celebrate completion
gptkbp:completed 2014
gptkbp:connects gptkb:US_Route_23
KY Route 1426
gptkbp:environmental_impact mitigated through planning
positive for the region
gptkbp:environmentalProtection conducted prior to construction
gptkbp:features two-lane roadway
gptkbp:feedback incorporated into design
gptkbp:foundedIn 2005
gptkbp:funding state and federal funds
gptkbp:futurePlans considered by planners
https://www.w3.org/2000/01/rdf-schema#label Pikeville Cut-Through Project
gptkbp:impact reduced congestion
gptkbp:includes bridges
retaining walls
drainage systems
gptkbp:is_designed_to gptkb:Kentucky_Transportation_Cabinet
heavy vehicles
gptkbp:is_funded_by federal_highway_administration
gptkbp:is_part_of Pikeville_transportation_plan
gptkbp:length 3.5 miles
gptkbp:localBusiness by improving access
gptkbp:localGovernment supported the project
gptkbp:location gptkb:Pikeville,_Kentucky
gptkbp:media_coverage extensive during construction
gptkbp:nearby_attractions boosted by improved access
gptkbp:notableWork gptkb:Pikeville_Bypass
gptkbp:offers $20 million
gptkbp:owner required for construction
gptkbp:passenger_traffic 2014
increased post-completion
analyzed post-construction
conducted before and after completion
gptkbp:productionCompany XYZ Construction
gptkbp:project gptkb:John_Doe
held in 2014
gptkbp:provides_access_to high during planning
downtown_Pikeville
gptkbp:purpose to improve traffic flow
gptkbp:safety_features for drivers and pedestrians
gptkbp:safetyFeatures improved after completion
gptkbp:travelTime between regions