Properties (61)
Predicate | Object |
---|---|
gptkbp:instanceOf |
bridge
|
gptkbp:awards |
received for design excellence
|
gptkbp:built |
2008
2013 6 years incremental launching overcoming tidal conditions addressed during construction |
gptkbp:community_engagement |
conducted during planning phase
|
gptkbp:communityEvents |
held on the bridge
|
gptkbp:connects |
Penang Island
Seberang Perai |
gptkbp:constructionMaterial |
steel and concrete
|
gptkbp:cultural_impact |
symbol of connectivity
|
gptkbp:design_feature |
aesthetic appeal
|
gptkbp:emergencyServices |
included
established |
gptkbp:environmental_impact |
boosted local businesses
considered during planning |
gptkbp:features |
two lanes in each direction
|
gptkbp:feedback |
considered during planning
|
gptkbp:future_plans |
delayed due to weather conditions
|
gptkbp:futurePlans |
under consideration
|
gptkbp:height |
approximately 30 meters above sea level
|
https://www.w3.org/2000/01/rdf-schema#label |
Penang Second Bridge
|
gptkbp:inspiration |
international standards
|
gptkbp:is_designed_to |
gptkb:UEM_Group_Berhad
|
gptkbp:is_part_of |
Federal Route 6
|
gptkbp:landmark |
yes
|
gptkbp:length |
24 kilometers
|
gptkbp:lighting |
LED lights installed
|
gptkbp:localGovernment |
yes
|
gptkbp:location |
Penang, Malaysia
|
gptkbp:maintenance |
regular inspections conducted
managed_by_Jambatan_Kedua_Sdn_Bhd |
gptkbp:nearby_attractions |
yes
enhanced by its presence |
gptkbp:nickname |
gptkb:Sultan_Abdul_Halim_Muadzam_Shah_Bridge
|
gptkbp:offers |
RM 4.5 billion
|
gptkbp:opened |
2014
|
gptkbp:openedIn |
Prime_Minister_Najib_Razak
|
gptkbp:passenger_traffic |
implemented
up to 100,000 vehicles per day monitored by sensors analyzed annually |
gptkbp:productionCompany |
gptkb:WSP_Global
collaborated with international firms local and foreign workers |
gptkbp:productLine |
1,500 meters
|
gptkbp:public_perception |
generally positive
|
gptkbp:public_transport_access |
limited
|
gptkbp:replacedBy |
Penang_Bridge_as_the_longest_bridge_in_Malaysia
|
gptkbp:safety_features |
advanced engineering standards
|
gptkbp:safetyFeatures |
monitored and reported
enforced on the bridge |
gptkbp:serves |
motor vehicles
|
gptkbp:significance |
economic_development_of_Penang
|
gptkbp:style |
modern engineering
|
gptkbp:toll |
yes
|
gptkbp:type |
suspension bridge
|
gptkbp:visitors |
available for visitors
|