Statements (23)
| Predicate | Object |
|---|---|
| gptkbp:instanceOf |
gptkb:railway_line
|
| gptkbp:closed |
Bedous to Canfranc (1970–2021)
|
| gptkbp:connects |
gptkb:Aragon
gptkb:Nouvelle-Aquitaine |
| gptkbp:crosses |
gptkb:Pyrenees
|
| gptkbp:endPoint |
gptkb:Canfranc
|
| gptkbp:gauge |
standard gauge
|
| http://www.w3.org/2000/01/rdf-schema#label |
Pau–Canfranc railway
|
| gptkbp:length |
63 km (Spanish section)
93 km (French section) |
| gptkbp:locatedIn |
gptkb:France
gptkb:Spain |
| gptkbp:notableBattle |
gptkb:Somport_Tunnel
|
| gptkbp:notableStation |
gptkb:Canfranc_International_railway_station
|
| gptkbp:opened |
1928
|
| gptkbp:operator |
gptkb:Renfe
gptkb:SNCF |
| gptkbp:purpose |
international rail link
|
| gptkbp:reopened |
Pau to Bedous (2016)
|
| gptkbp:startPoint |
gptkb:Pau
|
| gptkbp:status |
partially operational
|
| gptkbp:bfsParent |
gptkb:Gare_de_Pau
|
| gptkbp:bfsLayer |
6
|