Pattiseema Lift Irrigation Scheme
GPTKB entity
Statements (26)
Predicate | Object |
---|---|
gptkbp:instanceOf |
Irrigation project
|
gptkbp:benefit |
gptkb:Krishna_delta
gptkb:Rayalaseema_region |
gptkbp:capacity |
8500 cusecs
|
gptkbp:commissioned |
2016
|
gptkbp:connectsTo |
gptkb:Polavaram_Right_Main_Canal
|
gptkbp:country |
gptkb:India
|
gptkbp:district |
gptkb:Krishna
gptkb:West_Godavari |
https://www.w3.org/2000/01/rdf-schema#label |
Pattiseema Lift Irrigation Scheme
|
gptkbp:inaugurated |
gptkb:N._Chandrababu_Naidu
2016 |
gptkbp:location |
gptkb:Andhra_Pradesh
|
gptkbp:mainContractor |
gptkb:Megha_Engineering_&_Infrastructures_Ltd
|
gptkbp:notableFor |
First river interlinking project completed in India
|
gptkbp:numberOfPumps |
24
|
gptkbp:operator |
gptkb:Andhra_Pradesh_Government
|
gptkbp:projectCost |
Rs 1,300 crore
|
gptkbp:purpose |
Irrigation
Interlinking of rivers |
gptkbp:river |
gptkb:Godavari_River
|
gptkbp:status |
Operational
|
gptkbp:waterDivertedTo |
gptkb:Krishna_River
|
gptkbp:waterLiftedFrom |
gptkb:Godavari_River
|
gptkbp:bfsParent |
gptkb:Polavaram_Project
|
gptkbp:bfsLayer |
6
|