Pattiseema Lift Irrigation Project
GPTKB entity
Statements (24)
| Predicate | Object |
|---|---|
| gptkbp:instanceOf |
gptkb:Lift_Irrigation_Project
|
| gptkbp:benefit |
gptkb:Krishna_delta
gptkb:Rayalaseema_region |
| gptkbp:builtBy |
gptkb:Megha_Engineering_&_Infrastructures_Limited
|
| gptkbp:capacity |
8500 cusecs
|
| gptkbp:commissioned |
2016
|
| gptkbp:connectsTo |
gptkb:Krishna_River
|
| gptkbp:country |
gptkb:India
|
| gptkbp:feedSystem |
gptkb:Polavaram_Right_Main_Canal
|
| gptkbp:inaugurated |
gptkb:N._Chandrababu_Naidu
|
| gptkbp:locatedIn |
gptkb:West_Godavari_district
|
| gptkbp:location |
gptkb:Andhra_Pradesh
|
| gptkbp:notableFor |
First river interlinking project completed in India
|
| gptkbp:numberOfPumps |
24
|
| gptkbp:owner |
gptkb:Government_of_Andhra_Pradesh
|
| gptkbp:projectCost |
Rs 1300 crore
|
| gptkbp:purpose |
Irrigation
Interlinking of rivers |
| gptkbp:river |
gptkb:Godavari_River
|
| gptkbp:status |
Operational
|
| gptkbp:bfsParent |
gptkb:Andhra_Pradesh_Water_Resources_Department
gptkb:Godavari-Krishna_link |
| gptkbp:bfsLayer |
8
|
| https://www.w3.org/2000/01/rdf-schema#label |
Pattiseema Lift Irrigation Project
|