Statements (18)
Predicate | Object |
---|---|
gptkbp:instanceOf |
electric power transmission corridor
|
gptkbp:alsoKnownAs |
Path 15
|
gptkbp:capacityAfterUpgrade |
5400 MW
|
gptkbp:connects |
gptkb:Southern_California
gptkb:Northern_California |
https://www.w3.org/2000/01/rdf-schema#label |
Path 15 transmission line
|
gptkbp:length |
about 84 miles
|
gptkbp:locatedIn |
gptkb:California
|
gptkbp:notableFor |
alleviating transmission bottleneck in California
|
gptkbp:operatedBy |
gptkb:California_Independent_System_Operator
|
gptkbp:operatingSystem |
230 kV
500 kV |
gptkbp:partOf |
California transmission grid
|
gptkbp:purpose |
transmit electricity between northern and southern California
|
gptkbp:upgradedIn |
2004
|
gptkbp:upgradeIncreasedCapacity |
yes
|
gptkbp:bfsParent |
gptkb:PG&E_Corporation
|
gptkbp:bfsLayer |
7
|