Parbati Hydroelectric Project
GPTKB entity
Statements (21)
Predicate | Object |
---|---|
gptkbp:instanceOf |
gptkb:hydroelectric_power_station
|
gptkbp:capacity |
205 MW (Parbati II)
520 MW (Parbati III) 750 MW (Parbati I, planned) |
gptkbp:commissioned |
2014 (Parbati III)
|
gptkbp:country |
gptkb:India
|
gptkbp:developedBy |
gptkb:NHPC_Limited
|
gptkbp:district |
gptkb:Kullu
gptkb:Mandi |
https://www.w3.org/2000/01/rdf-schema#label |
Parbati Hydroelectric Project
|
gptkbp:locatedIn |
gptkb:Himachal_Pradesh
|
gptkbp:period |
Parbati I
Parbati II Parbati III |
gptkbp:purpose |
power generation
|
gptkbp:river |
gptkb:Parbati_River
|
gptkbp:status |
under construction
operational (Parbati III) |
gptkbp:type |
run-of-the-river
|
gptkbp:bfsParent |
gptkb:NHPC_Limited
|
gptkbp:bfsLayer |
6
|