Statements (24)
| Predicate | Object |
|---|---|
| gptkbp:instanceOf |
gptkb:NIST_SP_800-53_Control
|
| gptkbp:appliesTo |
gptkb:Federal_Information_Systems
|
| gptkbp:category |
gptkb:Security_Control
|
| gptkbp:controls |
PE-11
|
| gptkbp:family |
Physical and Environmental Protection
|
| gptkbp:improves |
PE-11(1) Alternate Power Supply Testing
PE-11(2) Automatic Transfer PE-11(3) Long-Term Alternate Power Supply |
| gptkbp:partOf |
gptkb:NIST_SP_800-53_Revision_5
|
| gptkbp:publishedBy |
gptkb:National_Institute_of_Standards_and_Technology
|
| gptkbp:purpose |
To provide emergency power to information system components in the event of a primary power source loss
|
| gptkbp:referencedIn |
gptkb:FIPS_200
CMMC Level 3 Controls FedRAMP Security Controls Baseline |
| gptkbp:relatedTo |
gptkb:Contingency_Planning
Business Continuity Disaster Recovery |
| gptkbp:requires |
Maintenance of emergency power systems
Testing of emergency power systems Provision of emergency power for essential information system components |
| gptkbp:status |
Active
|
| gptkbp:bfsParent |
gptkb:Physical_and_Environmental_Protection_(PE)
|
| gptkbp:bfsLayer |
7
|
| https://www.w3.org/2000/01/rdf-schema#label |
PE-11 Emergency Power
|