Statements (19)
Predicate | Object |
---|---|
gptkbp:instanceOf |
wind
|
gptkbp:capacity |
60 MW
|
gptkbp:commissioned |
2003
|
gptkbp:country |
gptkb:United_Kingdom
|
gptkbp:county |
gptkb:Denbighshire
|
gptkbp:distanceFromMainland |
7.5 km
|
gptkbp:first_large-scale_offshore_wind_farm_in_UK |
true
|
gptkbp:gridConnection |
St Asaph substation
|
gptkbp:hasTower |
30
|
https://www.w3.org/2000/01/rdf-schema#label |
North Hoyle Wind Farm
|
gptkbp:lake |
gptkb:Irish_Sea
|
gptkbp:latitude |
53.383
|
gptkbp:location |
gptkb:Liverpool_Bay
|
gptkbp:longitude |
-3.383
|
gptkbp:operator |
gptkb:RWE_Renewables
|
gptkbp:status |
operational
|
gptkbp:turbineType |
Vestas V80-2.0 MW
|
gptkbp:bfsParent |
gptkb:Vestas_V80
|
gptkbp:bfsLayer |
8
|