Nipigon River Bridge (cable-stayed)
                        
                            GPTKB entity
                        
                    
                Statements (21)
| Predicate | Object | 
|---|---|
| gptkbp:instanceOf | gptkb:bridge | 
| gptkbp:carries | gptkb:state_highway | 
| gptkbp:crosses | gptkb:Nipigon_River | 
| gptkbp:designer | Hatch Mott MacDonald | 
| gptkbp:firstOfItsKindInOntario | true | 
| gptkbp:length | 252 metres | 
| gptkbp:locatedIn | gptkb:Nipigon,_Ontario,_Canada | 
| gptkbp:mainContractor | gptkb:Ferrovial_Agroman Bot Construction | 
| gptkbp:mainSpan | 113 metres | 
| gptkbp:material | gptkb:steel concrete | 
| gptkbp:notableEvent | 2016 deck failure | 
| gptkbp:numberOfLanes | 4 | 
| gptkbp:opened | 2015 | 
| gptkbp:owner | gptkb:Ontario_Ministry_of_Transportation | 
| gptkbp:replacedBy | Old Nipigon River Bridge | 
| gptkbp:toll | no | 
| gptkbp:bfsParent | gptkb:previous_Nipigon_River_Bridge | 
| gptkbp:bfsLayer | 7 | 
| https://www.w3.org/2000/01/rdf-schema#label | Nipigon River Bridge (cable-stayed) |