NTPC Tapovan Vishnugad Hydro Power Plant
GPTKB entity
Statements (22)
Predicate | Object |
---|---|
gptkbp:instanceOf |
gptkb:hydroelectric_power_station
|
gptkbp:capacity |
520 MW
|
gptkbp:constructionStartYear |
2006
|
gptkbp:country |
gptkb:India
|
gptkbp:dam |
gptkb:concrete_gravity_dam
|
gptkbp:expectedCommissioning |
delayed
|
gptkbp:fuelType |
hydropower
|
gptkbp:hasTower |
4
|
https://www.w3.org/2000/01/rdf-schema#label |
NTPC Tapovan Vishnugad Hydro Power Plant
|
gptkbp:impact |
damaged by 2021 flood
|
gptkbp:location |
Tapovan, Chamoli district, Uttarakhand, India
|
gptkbp:notableEvent |
2021 Uttarakhand flood disaster
|
gptkbp:notableProject |
run-of-the-river
|
gptkbp:operator |
gptkb:NTPC_Limited
|
gptkbp:owner |
gptkb:NTPC_Limited
|
gptkbp:purpose |
electricity generation
|
gptkbp:river |
gptkb:Dhauliganga_River
|
gptkbp:status |
under construction
|
gptkbp:turbine_capacity |
130 MW
|
gptkbp:turbineType |
gptkb:Francis
|
gptkbp:bfsParent |
gptkb:NTPC
|
gptkbp:bfsLayer |
5
|