NASA Kennedy Space Center Shuttle Operations and Checkout Building
GPTKB entity
Statements (53)
Predicate | Object |
---|---|
gptkbp:instanceOf |
building
|
gptkbp:area |
approximately 1.2 million square feet
|
gptkbp:associatedWith |
gptkb:Space_Shuttle_program
|
gptkbp:capacity |
multiple_Space_Shuttle_orbiters
|
gptkbp:constructionMaterial |
1965
|
gptkbp:constructionStarted |
1962
|
gptkbp:designedBy |
NASA_engineers
|
gptkbp:features |
communication systems
air conditioning systems ground support equipment landscaping maintenance hangars security systems transportation systems administrative offices conference rooms training facilities environmental control systems exhibition space research facilities visitor center electrical systems parking facilities safety systems control rooms storage areas waste management systems plumbing systems crew quarters fire protection systems emergency response facilities high bay area fueling systems integration facilities launch support equipment testing chambers checkout facilities mockup facilities orbiter processing facilities payload processing areas |
gptkbp:firstIntroduced |
gptkb:STS-1
|
gptkbp:function |
preparation_of_Space_Shuttle_missions
|
gptkbp:height |
approximately 100 feet
|
https://www.w3.org/2000/01/rdf-schema#label |
NASA Kennedy Space Center Shuttle Operations and Checkout Building
|
gptkbp:lastProduced |
STS-135
|
gptkbp:location |
gptkb:Merritt_Island,_Florida
|
gptkbp:opened |
1965
|
gptkbp:operatedBy |
NASA
|
gptkbp:partOf |
gptkb:Kennedy_Space_Center
|
gptkbp:renovated |
2000
|
gptkbp:usedFor |
maintenance
testing vehicle assembly |