Statements (21)
| Predicate | Object |
|---|---|
| gptkbp:instanceOf |
gptkb:electricity_transmission_network
|
| gptkbp:connects |
Spanish national grid
Algerian national grid |
| gptkbp:country |
gptkb:Morocco
|
| gptkbp:expansion |
grid modernization
increase renewable energy share |
| gptkbp:interconnectionCapacityWithAlgeria |
1200 MW
|
| gptkbp:interconnectionCapacityWithSpain |
1400 MW
|
| gptkbp:operatedBy |
Office National de l'Electricité et de l'Eau Potable
|
| gptkbp:operatingSystem |
400 kV
150 kV 225 kV 60 kV |
| gptkbp:purpose |
electricity distribution
electricity transmission |
| gptkbp:supports |
renewable energy integration
conventional power plants |
| gptkbp:bfsParent |
gptkb:Noor_Ouarzazate_III
gptkb:Ouarzazate_Solar_Power_Station |
| gptkbp:bfsLayer |
8
|
| https://www.w3.org/2000/01/rdf-schema#label |
Moroccan national grid
|