Properties (49)
Predicate | Object |
---|---|
gptkbp:instanceOf |
metro line
|
gptkbp:annualRidership |
600,000 passengers
|
gptkbp:averageRainfall |
₹ 18,000 crore
|
gptkbp:communityImpact |
job creation
increased property values boost to local businesses improved accessibility enhanced public transport options |
gptkbp:connects |
Colaba
SEEPZ |
gptkbp:constructionStarted |
2016
|
gptkbp:design |
Larsen & Toubro
|
gptkbp:environmentalImpact |
reduced traffic congestion
reduced carbon footprint energy-efficient operations lower air pollution |
gptkbp:features |
green building certification
CCTV surveillance integrated ticketing system automatic train operation modern signaling system elevators and escalators Wi-Fi at stations platform screen doors air-conditioned coaches |
gptkbp:firstAwarded |
Bandra_to_SEEPZ
Colaba_to_Bandra |
gptkbp:futurePlans |
to_Dahisar
to_Kalyan to_Mira_Road to_Navi_Mumbai to_Thane |
https://www.w3.org/2000/01/rdf-schema#label |
Metro line 3
|
gptkbp:launchDate |
2023-01-19
|
gptkbp:length |
33.5 km
|
gptkbp:numberOfStations |
27
|
gptkbp:operatedBy |
gptkb:Mumbai_Metro
|
gptkbp:safetyFeatures |
evacuation plans
emergency communication systems earthquake-resistant design fire detection systems flood-resistant design |
gptkbp:significantEvent |
Colaba
Bandra Aarey_Colony D_N_Nagar BKC SEEPZ |
gptkbp:type |
underground
|