Statements (22)
| Predicate | Object |
|---|---|
| gptkbp:instanceOf |
gptkb:hydroelectric_power_station
|
| gptkbp:builtBy |
gptkb:BrightSource_Energy
gptkb:GE_Renewable_Energy |
| gptkbp:capacity |
121 MW
|
| gptkbp:commissioned |
2019
|
| gptkbp:connectedTo |
gptkb:Israeli_national_grid
|
| gptkbp:country |
gptkb:Israel
|
| gptkbp:hasTower |
250 meters
|
| gptkbp:locatedIn |
gptkb:Israel
gptkb:Negev_Desert |
| gptkbp:numberOfHeliostats |
over 50,000
|
| gptkbp:operatedBy |
gptkb:Megalim_Solar_Power_Ltd.
|
| gptkbp:partOf |
gptkb:Ashalim_Power_Station
|
| gptkbp:projectCost |
approximately $1.13 billion
|
| gptkbp:purpose |
electricity generation
|
| gptkbp:region |
Southern District
|
| gptkbp:renewableEnergySource |
solar energy
|
| gptkbp:technology |
gptkb:solar_power_tower
|
| gptkbp:type |
concentrated solar power
|
| gptkbp:bfsParent |
gptkb:Ashalim_Solar_Power_Station
|
| gptkbp:bfsLayer |
7
|
| https://www.w3.org/2000/01/rdf-schema#label |
Megalim Solar Power
|