Statements (26)
| Predicate | Object |
|---|---|
| gptkbp:instanceOf |
gptkb:hydroelectric_power_station
|
| gptkbp:boilerManufacturer |
gptkb:Hitachi
|
| gptkbp:capacity |
4,764 MW
approximately 794 MW |
| gptkbp:commissioned |
2015
|
| gptkbp:constructionStartYear |
2007
|
| gptkbp:coolingSystem |
dry-cooled
|
| gptkbp:country |
gptkb:South_Africa
|
| gptkbp:environmentalImpact |
gptkb:air_pollution
|
| gptkbp:fuelType |
gptkb:coal
|
| gptkbp:gridConnection |
Eskom national grid
|
| gptkbp:location |
gptkb:Lephalale
|
| gptkbp:namedAfter |
Medupi (meaning 'rain that soaks parched lands', in Sepedi)
|
| gptkbp:notableEvent |
Unit 4 explosion in August 2021
|
| gptkbp:numberOfRooms |
6
|
| gptkbp:owner |
gptkb:Eskom
|
| gptkbp:projectCost |
over R120 billion
|
| gptkbp:province |
Limpopo
|
| gptkbp:status |
operational
|
| gptkbp:turbine_manufacturer |
gptkb:Hitachi
|
| gptkbp:website |
https://www.eskom.co.za/whatweredoing/medupi/
|
| gptkbp:bfsParent |
gptkb:Lephalale
gptkb:Murray_&_Roberts gptkb:Eskom |
| gptkbp:bfsLayer |
7
|
| https://www.w3.org/2000/01/rdf-schema#label |
Medupi Power Station
|