Statements (55)
Predicate | Object |
---|---|
gptkbp:instance_of |
gptkb:cave
|
gptkbp:bfsLayer |
4
|
gptkbp:bfsParent |
gptkb:Istanbul,_Turkey
gptkb:Kingdom_of_the_former_Ottoman_Empire |
gptkbp:accessibility |
designed for all users
|
gptkbp:aircraft_operated |
8.5 meters
immersed tube tunnel modern engineering techniques modern passenger amenities sustainable practices incorporated |
gptkbp:annual_ridership |
increased since opening
|
gptkbp:archaeological_findings |
part of Istanbul's transport evolution
|
gptkbp:awards |
received engineering accolades
|
gptkbp:benefits |
reduces travel time
|
gptkbp:challenges |
geological conditions
overcame significant engineering hurdles |
gptkbp:connects |
European and Asian sides of Istanbul
to other rail lines |
gptkbp:constructed_in |
gptkb:2004
cut-and-cover |
gptkbp:cultural_significance |
connects historical regions
|
gptkbp:depth |
60 meters below sea level
|
gptkbp:educational_programs |
Yüksel Proje
|
gptkbp:environmental_impact |
minimized through design
|
gptkbp:expansion_plans |
planned to increase capacity
|
gptkbp:explores |
24/7 service
two main sections major infrastructure project in Turkey managed by Turkish State Railways |
gptkbp:features |
undersea rail tunnel
|
gptkbp:future_plans |
key to Istanbul's transport network.
|
gptkbp:has_public_transport |
integrated with bus and ferry services
|
https://www.w3.org/2000/01/rdf-schema#label |
Marmaray Tunnel
|
gptkbp:impact |
economic growth in Istanbul
|
gptkbp:length |
13.6 kilometers
|
gptkbp:location |
gptkb:Istanbul,_Turkey
|
gptkbp:maintenance |
regular inspections required
|
gptkbp:navigable |
gptkb:2012
|
gptkbp:opened |
October 29, 2013
|
gptkbp:operated_by |
gptkb:İstanbul_Ulaşım_A.Ş.
|
gptkbp:part_of |
gptkb:Marmaray_project
|
gptkbp:price |
approximately $4 billion
|
gptkbp:project |
gptkb:Marmaray
9 years |
gptkbp:receives_funding_from |
Turkish government and international loans
|
gptkbp:related_to |
gptkb:Istanbul_Metro
|
gptkbp:safety_features |
earthquake-resistant design
monitored by authorities |
gptkbp:serves |
gptkb:railway_line
|
gptkbp:significance |
gptkb:first_rail_tunnel_under_the_Bosphorus_Strait
|
gptkbp:stations |
4 underground stations
|
gptkbp:supports |
75,000 passengers per hour
|
gptkbp:technology |
advanced signaling systems
|
gptkbp:transmission |
heavy rail
|
gptkbp:upgrades |
ongoing improvements planned
|