Malmö City Tunnel

GPTKB entity

Statements (49)
Predicate Object
gptkbp:instance_of gptkb:cave
gptkbp:connects Malmö Central Station
gptkbp:construction_method cut-and-cover
gptkbp:construction_started gptkb:2005
5 years
gptkbp:depth up to 30 meters
gptkbp:designed_by gptkb:WSP_Global
gptkb:Tyréns
gptkbp:environmental_impact reduced air pollution
reduced noise pollution
gptkbp:features two tracks
gptkbp:future_plans expansion of services
increased frequency of trains
integration with other transport modes
improvements to stations
https://www.w3.org/2000/01/rdf-schema#label Malmö City Tunnel
gptkbp:includes two underground stations
gptkbp:is_funded_by gptkb:European_Union
gptkb:Skåne_County
gptkb:Swedish_government
gptkb:Malmö_Municipality
gptkbp:length 6.5 kilometers
gptkbp:location gptkb:Malmö,_Sweden
gptkbp:open_to_public December 2010
gptkbp:opened gptkb:2010
gptkbp:operator gptkb:Skånetrafiken
gptkbp:part_of gptkb:Öresund_Line
gptkbp:passenger_capacity up to 10,000 passengers per hour
gptkbp:price approximately 4.5 billion SEK
gptkbp:project gptkb:Öresund_Bridge
City Tunnel Project
Hyllie Station development
Malmö Central Station upgrade
Triangeln Station development
gptkbp:projected_to_reduce traffic congestion
gptkbp:safety_features surveillance systems
fire safety systems
emergency exits
ventilation systems
gptkbp:serves gptkb:Öresundståg
gptkbp:significance improves regional connectivity
supports urban development
facilitates cross-border travel
enhances public transport
gptkbp:stations gptkb:Triangeln
Hyllie
gptkbp:type gptkb:cave
gptkbp:bfsParent gptkb:Malmö_Metro
gptkbp:bfsLayer 6